EPA OOOOb / OOOOc
Cut station emissions without giving up control.
Gas-powered pilots, positioners and actuators vent methane every time they move. We help utilities and pipelines replace them with zero-bleed and zero-emission equipment, sized to the station you already have.

Where station emissions come from
Most vented gas at regulator and control valve stations comes from the instrumentation, not the pipe.
- Gas-powered pilots and controllersContinuous- and intermittent-bleed pneumatic controllers vent supply gas to atmosphere as they regulate.
- Gas-powered actuatorsGas-over-oil, vane and scotch-yoke actuators exhaust gas on every stroke.
- Pilot gas heatersCatalytic heaters burn gas around the clock to keep pilots from freezing.
- Maintenance blowdownsEvery regulator rebuild means isolating and venting part of the station.
EPA’s OOOOb (new and modified sources) and OOOOc (existing sources, through state plans) methane rules target vented gas from process controllers and other station equipment. Compliance dates have been moving, so tell us where your sites stand and we’ll plan the retrofit to the current requirements. EPA rule overview (PDF)
We supply and support the equipment; your compliance team owns the reporting.
Zero-emission equipment we supply
Each one is sized and quoted to the station, with start-up support.






Before and after
Stations where PtNGS supplied the upgrade.





Presentations
Planning methane-rule retrofits?
Send us the station list and what’s installed today. Call (484) 897-0345 or email info@ptngs.com.

